Electromechanical Equipment In
Electromechanical Equipment In

Electromechanical Equipment Installation Construction Service Introduction

一、Enterprise Qualification

    The company possesses first grade qualification of professional contract for electrochemical equipment installation, has under it a professional installation engineering branch company.

二、Construction Capability

   To undertake the installation of equipment, lines and pipes for ordinary, public and civil construction projects; and the installation of variable distribution station below 35kv and non-standard steel member.

三、Representative projects

   Complete installation projects for water, electricity, heating, air conditioning, boiler and cold station; chemical equipment installation engineering of Weifang Fertilizer Plant; equipment and pipe installation engineering of Weifang Wastewater Treatment Plant; 35- ton boiler installation equipment of Weifang Heating Company, etc.

Weifang Wastewater Treatment Plant: output value for installation reaches more than 13 million Yuan (imported equipment), according different construction phase, it was awarded Yuandu Cup project, excellent project and up to standard project. (The picture is primary settling tank equipment installation engineering) Weifang Wastewater Treatment Plant: output value for installation reaches more than 13 million Yuan (imported equipment), according different construction phase, it was awarded Yuandu Cup project, excellent project and up to standard project. (The picture is secondary settling tank equipment installation engineering)

Weifang Haihua Fengyuan Fertilizer Co., Ltd 4 changed 6 Item: output value for installation is over 3.3 million Yuan, it was awarded Provincial Excellent Project by Provincial Installation Association. The installation of 35-ton boiler for Weifang Heating Power Company

Neo-luck Group Plastic Cement Workshop: output value for installation is 7.2 million Yuan (imported equipment), it was awarded excellent project. The picture is membrane production line equipment installation engineering.  Neo-luck Group Plastic Cement Workshop: output value for installation is 7.2 million Yuan (imported equipment), it was awarded excellent project.


The picture is cold station equipment installation engineering, drainage installation for construction engineering installation (“Taishan Cup”project—Weifang University Library Project) Heating installation for construction engineering installation ( “Yuandu Cup” engineering- Weifang East Passenger Coach Station engineering)


Weifang Haihua Fengyuan Fertilizer Co., Ltd 4 changed 6 Item: output value for installation is over 3.3 million Yuan, it was awarded Provincial Excellent Project by Provincial Installation Association Fire fighting equipment installation for construction engineering installation (“ Yuandu” Cup Project- Weifang University Library Project)